IRAQ-Baiji Refinery - 2011 North Refineries Co. (NRC) Chemoproject – Czech Rafidain Oil Services Co. (ROSCO) Baiji – Iraq

Civil Works

  • Erection of Steel Structures (403 ton).
  • Fire proofing of structural steel by Concrete casting thickness 50 mm surrounding Steel Structures elements, amount 260m³.
  • Chemical/Oily water drains and storm drains,by Making new clean out for oily water sewage concrete casting new manholes.
  • Make new concrete Trench Covers, different widths (60 cm-170 cm), and length 239 m.
  • Completion of control house, including substation and Supply and installation of local split units on control house & SG room.
  • Roads and unit Concrete casting, amount 1061 m³.

Mechanical Works

  • Complete piping (length 15719 m, weight 427 ton) including erection valves, hangers up to 36” dia. Of CS, SS, heavy wall and alloy steel.
  • Erection & completion of all equipment (compressor, heat exchangers, boiler, air cooler & its steel structures ,Column C-101, Column C-102 and process furnaces
  • All painting and insulation works.
 

Electrical and Instrumentation works

  • Fire alarm systems & Gas detection system.
  • Control, 7 cabinet Instrument Room, 4cabinet UPC ,4 cabinet ,2 cabinet Batteries,1 cabinet Telephone ,1 cabinet Intercomand DCS control system (computers).
  • Switch Gear Hall containing 11 KV SwitchGear 17 cabinet, 4 cabinet ASP, 4 cabinetDCS, 17 cabinet PC, 9 cabinet MCC
  • Power cabling over 3 km (11 KV) Power cables.
  • Two auxiliary transformers 6.6/0.4 KV(1.25 MVA) each.
  • CATHODIC PROTECTION, 3 systems.
  • Earthing & Lighting for project.
  • Two transformers 33/6,6 KV (6 MVA)each.
  • Erection of instrument Cable total length 31,488 m & 585 Instruments total quantity & 1720 Termination ends.
  • Erection of electrical parts, Erection of Cable total length 38,829
 

Testing & Commissioning

  • Completion of pressure parts and preparation for pressure test ROSCO done pressure test pipe line quantity 430 lines.
  • Complete Pre-commissioning responsibility.
  • Commissioning support as directed by Axens IFP Group Technologies’ (France) and client (NRC).

 