IRAQ - TUBA / West Qurna 2012
Home » Projects » IRAQ - TUBA / West Qurna 2012

IRAQ - TUBA / West Qurna  2012 

Project Name

Client

Main Contractor

Subcontractor

Location

IRAQ - TUBA / West Qurna  2012  Lukoil Mid-East Ltd. Consortium of Entrepose Contracting & (ROSCO). Rafidain Oil Services Co. (ROSCO) Baiji – IraqTUBA / West Qurna

 

 

 

 

EPC of 3*66,000 M3 Crude Oil Floating Roof  Storage Tanks.

Constructiion of 3 double deck Crude oil Floating Roof Storage Tanks with a capacity of 66,000 m3 each. These tanks are located in the Tuba Tank Farm in Basra South of Iraq, approximately 60 km’s from Basra City.The tanks span at 91 m in diameter and at a height of 10m cumulating to approximately 1500 metric tons empty weight.

ROSCO scope of work includes civil earthworks, foundation preparation, installation and erection of tank base plates, shells and roof, associated piping, bund walls and fre protection system.Entrepose,  the projets Consortium leader, is responsible for all engineering design work and procurement and supplyof permanent materials on site. 

 

| Image 1 of 15 |

777777

Image: 
© 2018 Developed by Blue Ray for Web Solutions. All rights reserved